I'm behind again (big surprise). Below are pictures of the various projects we have had going. The partition wall is built and drywalled so now we have to hire someone to tape and mud and then I will paint. Little John was being a couch potato so that is why most of the pictures are of Caleb.
The bottom pictures are of the house when it was insulated at the end of June. The insulators took off the siding, drilled hole and then proceed to pump in insulation. It took them almost a week and we are looking forward to a warmer house this winter.
No comments:
Post a Comment